Stabirail
|
monday
16 march
|
On appointment |
| On appointment | |
|
tuesday
10 march
|
On appointment |
| On appointment | |
|
wednesday
11 march
|
On appointment |
| On appointment | |
|
thursday
12 march
|
On appointment |
| On appointment | |
|
friday
13 march
|
On appointment |
| On appointment | |
|
saturday
14 march
|
Closed |
|
sunday
15 march
|
Closed |
Any information incorrect? Please let us know!
| Closed on monday 6 april 2026 for Easter Monday |
| Doornpark 10
, 9120 Beveren map |
|
|---|---|
| Phone: | +32 485 55 27 75 |
| E-mail: | info@stabirail.com |
| Website: | stabirail.com |
Stabirail has designed and developed a new method for ballastless track or slab track construction in tunnels and railway stations. Our ground-breaking system has proven to be the most efficient method for laying ballastless railway tracks in concrete beds. Furthermore our new slab track or ballastless track construction method guarantees higher accuracy, longer design life and lower whole-life cost.